Latest News

  • Kwik-ZIP to Exhibit at Ozwater’23

    Kwik-ZIP to Exhibit at Ozwater’23

    We are excited to exhibit at the upcoming Ozwater’23 event at the ICC, Sydney from May 10-12! You will find us on Stand C27, and we would be happy to discuss our product range and answer any questions you may have regarding our products. Grab your free Trade Visitor pass and join us for an incredible…

    read more

  • Kwik-ZIP Offers the Best Corrugated Pipe Installations Solution

    Kwik-ZIP Offers the Best Corrugated Pipe Installations Solution

    Designed to be compatible with all types of pipe material, kwik-ZIP’s HD and HDX/HDXT spacer system series can be used on and in corrugated pipe installations. Manufactured from high-grade thermoplastic, kwik-ZIP’s casing spacer and centraliser products are used and recommended by pipeline and civil contractors, water and gas utilities, drilling companies and international engineering firms.…

    read more

  • Kwik-ZIP to Exhibit at WIOA Bendigo 2023

    Kwik-ZIP to Exhibit at WIOA Bendigo 2023

    Kwik-ZIP to Exhibit at 2023 Victorian Water Industry Operations Conference & Exhibition. Kwik-ZIP are pleased to be exhibiting at the 2023 Water Industry Operators Association of Australia (WIOA) 84th Victorian Water Industry Operations Conference and Exhibition at the Bendigo Exhibition Centre on the 29 & 30th March 2023. You will find us on Booth 116,…

    read more

  • kwik-ZIP spacers help with corrosion management

    kwik-ZIP spacers help with corrosion management

    Corrosion accelerates degradation and reduces the life of pipeline infrastructure, costing the industry millions of dollars in rehabilitation, rebuilding, and down time. kwik-ZIP knows the importance of having a corrosion management system in place and spacers are a readily available solution component available to help and reduce costs. This article featured in the February edition of The Australian Pipeliner. All content…

    read more

  • Australia’s kwik-ZIP and the case of San Francisco’s sinking Millennium Tower

    Australia’s kwik-ZIP and the case of San Francisco’s sinking Millennium Tower

    301 Mission Street is getting a helping hand from Australian-owned kwik-ZIP Spacers as the building foundations are being modified in an effort to keep it from sinking. This article featured in the November edition of The Australian Pipeliner. To read the full version, please click below. Click Here

    read more

  • Kwik-ZIP to Exhibit at NGWA GroundWater Week 2022

    Kwik-ZIP to Exhibit at NGWA GroundWater Week 2022

    Kwik-ZIP to Exhibit at NGWA GroundWater Week 2022 Kwik-ZIP are pleased to be exhibiting at the 2022 National Ground Water Association (NGWA) Groundwater Week in Las Vegas, Nevada from December 6 – 8. You will find us on Booth 1433 in the Exhibition Hall at the Las Vegas Convention Center, and we would be happy…

    read more

  • Trenchless Water Main Installation – Elizabeth Drive, Badgerys Creek, NSW

    Trenchless Water Main Installation – Elizabeth Drive, Badgerys Creek, NSW

    Project: Trenchless Water Main InstallationLocation: Badgerys Creek, NSW Carrier Size: 813mmOD Steelmains SintakoteCasing Size: 1026mmID RC Jacking pipe (Humes C4 FJP)Run Length: 180mSpacer Model: HDX-90 (90mm high) On a recent Water Main installation project in Badgerys Creek NSW, Sydney Water contractor Quickway utilised Kwik-ZIP HDX-90 spacers to facilitate the slip-lining of an 813mmOD Steelmains Sintakote…

    read more

  • No-Dig Down Under (14-17 June 2022)

    No-Dig Down Under (14-17 June 2022)

    Kwik-ZIP Spacers are pleased to be exhibiting at No-Dig Down Under on 14-17 June 2022, at the International Convention Centre (ICC) Sydney. Please feel free to come and visit us on Stand # 078 where our staff will be more than happy to discuss our product range, any specific project requirements that we can assist…

    read more

  • Ozwater22 – Brisbane Convention & Exhibition Centre

    Ozwater22 – Brisbane Convention & Exhibition Centre

    Kwik-ZIP Spacers are pleased to be exhibiting at Ozwater22 on 10-12 May 2022, at the Brisbane Convention and Exhibition Centre. Please feel free to come and visit us on Stand B15 where our staff will be more than happy to discuss our product range, any specific project requirements that we can assist you with or…

    read more

  • Ozwater22 – Brisbane Convention & Exhibition Centre

    Ozwater22 – Brisbane Convention & Exhibition Centre

    Kwik-ZIP Spacers are pleased to be exhibiting at Ozwater22 on 10-12 May 2022, at the Brisbane Convention and Exhibition Centre. Please feel free to come and visit us on Stand B15 where our staff will be more than happy to discuss our product range, any specific project requirements that we can assist you with or…

    read more

  • Highways England M42 J6 Diversion – Birmingham UK

    Highways England M42 J6 Diversion – Birmingham UK

    Project: Highways England M42 J6 DiversionLocation: Birmingham UK Carrier Size: 4-pipe bundle (2 x DN 180 HDPE and 2 x DN450 HDPE)Casing Size: 1500mm ID RCP SleeveRun Length: 135mSpacer Model: HDXT-43 (43mm high) Kwik-ZIP HDXT-43 spacers were used by UK infrastructure services and engineering company Amey to facilitate the slip-lining of a four-pipe bundle for…

    read more

  • HEB Construction – Te Maunga Landward Section Outfall

    HEB Construction – Te Maunga Landward Section Outfall

    Project: Te Maunga Landward Section OutfallLocation: Bay of Plenty, NZInstallation Date: October 2021 Carrier Size: DN1200mm PE water pipelineCasing Size: 1500mm Concrete DuctRun Length: 100mSpacer Model: HDXT 103 Where are the kwik-Zip spacers being used and why? The kwik-Zip spacers have been installed as part of the Te Maunga Outfall pipeline project located in Tauranga,…

    read more

  • Rail infrastructure Alliance Water Main Project Sunbury Victoria Australia

    Rail infrastructure Alliance Water Main Project Sunbury Victoria Australia

    Project: Rail infrastructure Alliance Water Main Project Sunbury Victoria Carrier Size: 355mm HDPE Water Main Casing Size: PN8 630mm casing (570mm ID) Run Length: 66m Spacer Model: HDX-90 (90mm high) On a recent Rail Infrastructure Alliance project in Sunbury, horizontal and directional drilling specialist contractor Jelmac Directional Drilling utilised Kwik-ZIP HDX-90 spacers to assist facilitate…

    read more

  • Kwik-ZIP Spacers to exhibit at Ozwater21

    Kwik-ZIP Spacers to exhibit at Ozwater21

    Kwik-ZIP Spacers are pleased to be exhibiting at Ozwater21 on 4-6 May 2021, at the Adelaide Convention Centre. Please feel free to come and visit us on Stand E26 where our staff will be more than happy to discuss our product range, any specific project requirements that we can assist you with or simply answer…

    read more

  • Water Main Upgrades

    Water Main Upgrades

    Project: Water Main Upgrades Carrier Size: DN125 PE Water main Casing Size: DN330 ST Gas Main (abandoned) Spacer Model: HD-30 (30mm high) Kwik-ZIP® HD-30 spacers were installed to facilitate the slip-lining of DN125 PE Water Main into abandoned DN330 ST Gas Mains.  Given the abandoned gas mains had numerous internal protrusions (joins and welds) there was…

    read more