HD Series

HD Series Casing Spacers: FOR Trenchless and Cased Crossings, Slip Lining, Gravel Packed Well Screens, Pump Torque Arrestor, Water Well Casing, Coal Seam Methane Casing, Pump Riser/Submersible Pump Installation, and Piling

HD Series casing spacer – available in:

  • HD 30 – 30mm Bow (1.18″ Bow)
  • HD 50 – 50mm Bow (2″ Bow)
  • HD 75 – 75mm Bow (3″ Bow)
  • HD 100 – 100mm Bow (4″ Bow)

This bow spring casing spacer model will centralize pipe and casing diameters of 110mm (4.33in) OD to greater than 1600mm (63in) OD.

The HD series bow spring centralizers are available in bow heights of 30mm (1.18 in), 50mm (2 in),75mm (3 in), and 100mm (4 in).

Its unique features include a curved bow spring with superior centralizing force.

Some of the centralizing and casing spacer applications include, but are not limited to:

  • Carrier pipe spacers for cased crossings, (Also referred to as pipe slippers, insulators, skids, thinsulators, bow spring centralizers and pipe spiders).
  • Grade Control for wastewater and sewer pipelines
  • Gravel packed well screen.
  • Well production casing, including PVC, Steel, and Fiberglass Casing
  • Pile Centralizer.
  • Centralizers for Mine Paste Backfill Bores.
  • Torque Arrestor for Submersible Pumps.

No special tools are required to assemble the HD Series casing spacers.

Installation Guide for the HD Series
HD Product Information Sheet (Vertical application) HD Product Information Sheet (Horizontal application)

Video Gallery

Upgrading water mains made easy
HD 50 spacers on DN560 HDPE 560mm OD into a DN700 Mild Steel Pipe
HD 30 in open bore on PVC for Gravity Sewer in Victoria L&D Microtunnelling Movie 1
HD 30 in open bore on PVC for Gravity Sewer in Victoria L&D Microtunnelling Movie 2
HD on semi elliptical FRP pipe for sewer replacement Los Angeles
Inserting 300m of 125PE into a 330 AB gas main

Image Gallery

kwik-ZIP HD Series: Slip Lining, Trenchless and Cased Crossings, Gravel Packed Well Screens, Pump Torque Arrestor, Water Well Casing, Coal Seam Methane Casing, Piling, Pump Riser and Submersible Pump Installation.