Project Brief

  • South Street Gravity Sewer

    South Street Gravity Sewer

     Project: South Street Gravity Sewer Carrier Size: DN600 SewerMax® carrier pipe with 682mm OD   Casing Size: DN800 Mild Steel with 794mm ID   Run Length:     64m Spacer Model: HDXT 43 Kwik-ZIP® HDXT 43 spacers were installed to facilitate the slip-lining of a crossing as part of the South Street Gravity Sewer Project. …


  • Cairns Water Security Project

    Cairns Water Security Project

     Project: Cairns Water Security Project Carrier Sizes: 1125mm, 914mm, 508mm, & 914mm OD MSCL carriers   Casing Size 1,351mm, 692mm, & 1193mm ID MSCL casings over numerous crossings   Run Length:     2 x 61m runs and 3 x 40m runs Spacer Model: HDXT 103 and HDXT 63’s Kwik-ZIP® HDXT 103 and HDXT 63’s…


  • A465 Heads of the valley Road Widening – Hirwan – South Wales

    A465 Heads of the valley Road Widening – Hirwan – South Wales

    Project:     A465 Heads of the Valley Road Widening – Pipe Diversions Using Kwik-ZIP HDXT-153 Spacers   Carrier Size: 711mm and 1,118mm OD coated and lined steel pipe   Casing Size: 1,050mm and 1,500mm ID precast concrete   Run Length:     4 x runs (2 x 35m and 2 x 47.5m)   Spacer…


  • M1 Pacific Motorway Extension

    M1 Pacific Motorway Extension

    Project: M1 Pacific Motorway Extension Carrier Size: 1219mm OD SINTAKOTE® Steel MSCL   Casing Size: 1574mm ID GRP   Run Length:     2 x runs (62m & 127m)   Spacer Model: HDXT-153 (153mm high) Kwik-ZIP customer Vaughan Civil recently utilised Kwik-ZIP HDXT-153 spacers were recently used to facilitate the slip-lining of two water main…


  • Alkimos SDP Yanchep Rail Corridor

    Alkimos SDP Yanchep Rail Corridor

    Project: Alkimos SDP Yanchep Rail Corridor   Carrier Size: 914mm & 1422 SINTAKOTE® Steel MSCL   Casing Size: 1399 & 1708mm RCJP   Run Length:     2 x runs – 56m each   Spacer Model: HDXT-103 (103mm high) with Load Inserts (LI-XT-103) A key Kwik-ZIP customer recently utilised Kwik-ZIP HDXT-103 spacers with kwik-ZIP load…


  • Upper South Creek Treated Water Main

    Upper South Creek Treated Water Main

    Project: Upper South Creek Treated Water MainCarrier Size: 914mm SINTAKOTE® Steel MSCLCasing Size: 1200mm RCJPRun Length:105mSpacer Model: HDXT-103 (103mm high) Kwik-ZIP customers Jonishan recently utilised Kwik-ZIP HDXT-103 spacers to facilitate the slip-lining of a 914mm SINTAKOTE® Steel MSCL carrier pipe into a 1200mm ID RCJP casing for the Upper South Creek Treated Water Main.This installation…


  • Trans Mountain Pipeline Expansion Project

    Trans Mountain Pipeline Expansion Project

    Project: Trans Mountain Pipeline ProjectLocation: Alberta & British Columbia – Canada Carrier Size: 30” Steel 483 grade 2 pipeCasing Size: 60” steel casingSpacer Model: HDXT-58W with Load Inserts Kwik-ZIP spacers were recently utilised on a specific section of the Trans Mountain Pipeline Expansion Project in Canada to assist one of the contractors working on the…


  • Fitzroy to Gladstone Pipeline

    Fitzroy to Gladstone Pipeline

    Project: Fitzroy to Gladstone (F2G) Pipeline Location: Central Queensland Carrier Size: 1067mm OD SINTAKOTE® Steel MSCLCasing Size: 1290mm ID RCJP casingRun Length: 4 x crossings (26M, 107m, 135m & 16m)Spacer Model: HDX-90 (90mm high) Kwik-ZIP customers GCE Contractors utilised Kwik-ZIP HDX-90 spacers to facilitate the slip-lining of a 1067mm OD SINTAKOTE® MSCL carrier pipe into…


  • Gosnells Main Pumping Station – Wastewater pressure Main Realignment

    Gosnells Main Pumping Station – Wastewater pressure Main Realignment

    Project: Gosnells Main Pumping Station – Wastewater pressure RealignmentLocation: Gosnells WA Carrier Size: DN900 MSCL carrierCasing Size: DN1200 RC Jacking pipeRun Length: 48m under rail crossingSpacer Model: HDXT 103’s Kwik-ZIP® HDXT-103 spacers were installed to facilitate the slip-lining of a MSCL Wastewater pressure main into a RC Jacking pipe running under a rail line for…


  • Forches Cross LTS Diversion, Newton Abbot, Devon, UK

    Forches Cross LTS Diversion, Newton Abbot, Devon, UK

    Project: Forches Cross LTS Diversion, Newton Abbot, DevonLocation: UK Carrier Size: 500mm OD API 5L steel pipe (L360)Casing Size: 1200mm ID Concrete sleeveRun Length: 40m crossingSpacer Model: HDX-90 Kwik-ZIP HDX-90 spacers were recently utilised on a gas main crossing in Devon, Southwest England. The Forches Cross LTS Diversion involved the sleeving of a 40m 500mm…


  • Western Outer Ring Main (‘WORM’) – Buried Gas Transmission Pipeline Project

    Western Outer Ring Main (‘WORM’) – Buried Gas Transmission Pipeline Project

    Project: Western Outer Ring Main (‘WORM’) – Buried Gas Transmission Pipeline Project Location: Victoria Carrier Size: 508mm OD high-strength steel line pipe with an external epoxy coatingCasing Size: Various – Crossing dependentRun Length: Approx 500m of cased crossingsSpacer Model: HDX-38’s, HDX-125 and HDXT-63’s The Western Outer Ring Main project in Victoria is a pipeline installation…


  • South Geelong Station – Water Main Relocation Project, Victoria – Barwon Water

    South Geelong Station – Water Main Relocation Project, Victoria – Barwon Water

    Project: South Geelong Station – Water Main Relocation Project Location: Victoria – Barwon Water Carrier Size: 660mm OD MSCL Steel Mains Sintakote®Casing Size: 800mm ID RCP casingRun Length: 54mSpacer Model: HDXT-58W (58mm high) On a recent Water Main relocation project in Victoria, McConnell Dowell utilised Kwik-ZIP HDXT-58W spacers to facilitate the slip-lining of a 660mm…


  • Barwon Water DN450 Relocation Project – Marshall, Victoria

    Barwon Water DN450 Relocation Project – Marshall, Victoria

    Project: Barwon Water DN450 Relocation ProjectLocation: Marshall, Victoria Carrier Size: 560mm OD HDPE Water MainCasing Size: 794mm ID GRP casingRun Length: 260mSpacer Model: HDXT-58W (58mm high) On a recent Water Main Project in Victoria, McConnell Dowell utilised Kwik-ZIP HDXT-58W spacers to facilitate the slip-lining of a 560mmmm HDPE carrier pipe over a 260-metre run.  Whilst…


  • Kwik-ZIP Offers the Best Corrugated Pipe Installations Solution

    Kwik-ZIP Offers the Best Corrugated Pipe Installations Solution

    Designed to be compatible with all types of pipe material, kwik-ZIP’s HD and HDX/HDXT spacer system series can be used on and in corrugated pipe installations. Manufactured from high-grade thermoplastic, kwik-ZIP’s casing spacer and centraliser products are used and recommended by pipeline and civil contractors, water and gas utilities, drilling companies and international engineering firms.…


  • kwik-ZIP spacers help with corrosion management

    kwik-ZIP spacers help with corrosion management

    Corrosion accelerates degradation and reduces the life of pipeline infrastructure, costing the industry millions of dollars in rehabilitation, rebuilding, and down time. kwik-ZIP knows the importance of having a corrosion management system in place and spacers are a readily available solution component available to help and reduce costs. This article featured in the February edition of The Australian Pipeliner. All content…


  • Australia’s kwik-ZIP and the case of San Francisco’s sinking Millennium Tower

    Australia’s kwik-ZIP and the case of San Francisco’s sinking Millennium Tower

    301 Mission Street is getting a helping hand from Australian-owned kwik-ZIP Spacers as the building foundations are being modified in an effort to keep it from sinking. This article featured in the November edition of The Australian Pipeliner. To read the full version, please click below. Click Here


  • Trenchless Water Main Installation – Elizabeth Drive, Badgerys Creek, NSW

    Trenchless Water Main Installation – Elizabeth Drive, Badgerys Creek, NSW

    Project: Trenchless Water Main InstallationLocation: Badgerys Creek, NSW Carrier Size: 813mmOD Steelmains SintakoteCasing Size: 1026mmID RC Jacking pipe (Humes C4 FJP)Run Length: 180mSpacer Model: HDX-90 (90mm high) On a recent Water Main installation project in Badgerys Creek NSW, Sydney Water contractor Quickway utilised Kwik-ZIP HDX-90 spacers to facilitate the slip-lining of an 813mmOD Steelmains Sintakote…


  • Highways England M42 J6 Diversion – Birmingham UK

    Highways England M42 J6 Diversion – Birmingham UK

    Project: Highways England M42 J6 DiversionLocation: Birmingham UK Carrier Size: 4-pipe bundle (2 x DN 180 HDPE and 2 x DN450 HDPE)Casing Size: 1500mm ID RCP SleeveRun Length: 135mSpacer Model: HDXT-43 (43mm high) Kwik-ZIP HDXT-43 spacers were used by UK infrastructure services and engineering company Amey to facilitate the slip-lining of a four-pipe bundle for…


  • HEB Construction – Te Maunga Landward Section Outfall

    HEB Construction – Te Maunga Landward Section Outfall

    Project: Te Maunga Landward Section OutfallLocation: Bay of Plenty, NZInstallation Date: October 2021 Carrier Size: DN1200mm PE water pipelineCasing Size: 1500mm Concrete DuctRun Length: 100mSpacer Model: HDXT 103 Where are the kwik-Zip spacers being used and why? The kwik-Zip spacers have been installed as part of the Te Maunga Outfall pipeline project located in Tauranga,…


  • Rail infrastructure Alliance Water Main Project Sunbury Victoria Australia

    Rail infrastructure Alliance Water Main Project Sunbury Victoria Australia

    Project: Rail infrastructure Alliance Water Main Project Sunbury Victoria Carrier Size: 355mm HDPE Water Main Casing Size: PN8 630mm casing (570mm ID) Run Length: 66m Spacer Model: HDX-90 (90mm high) On a recent Rail Infrastructure Alliance project in Sunbury, horizontal and directional drilling specialist contractor Jelmac Directional Drilling utilised Kwik-ZIP HDX-90 spacers to assist facilitate…


  • Water Main Upgrades

    Water Main Upgrades

    Project: Water Main Upgrades Carrier Size: DN125 PE Water main Casing Size: DN330 ST Gas Main (abandoned) Spacer Model: HD-30 (30mm high) Kwik-ZIP® HD-30 spacers were installed to facilitate the slip-lining of DN125 PE Water Main into abandoned DN330 ST Gas Mains.  Given the abandoned gas mains had numerous internal protrusions (joins and welds) there was…


  • Claremont Rail – Cased Crossing – Claremont, WA

    Claremont Rail – Cased Crossing – Claremont, WA

    Project: Claremont Rail – Cased Crossing Claremont, Western AustraliaCarrier Size: 180mm PE Water MainCasing Size: RCP 500mm (ID)Spacer Model: HDXT-153 (153mm high) Kwik-ZIP® HDXT-153 spacers were installed to facilitatethe slip-lining of a 180mm PE Water Main into an RCP casing for a cased crossing as part of the Claremont Rail Project by GM Microtunnelling. As…


  • Metro Tunnel – Arden Street Station, Melbourne Victoria

    Metro Tunnel – Arden Street Station, Melbourne Victoria

    Project: Metro Tunnel – Arden Street Station, Melbourne VictoriaCarrier Size: 225 PVCCasing Size: 370mm BoreSpacer Model: HD-50 (50mm high) Kwik-ZIP® HD-50 spacers were utilised to facilitate the installation of 2 x 10-meter storm water pipes as part of Metro Tunnels development of the new Arden Street Station. kwik-ZIP’s large range of spacers caters for a…


  • HEB Construction – Waiari Trunk Watermain

    HEB Construction – Waiari Trunk Watermain

    Project: Waiari Trunk Watermain Part ALocation: Bay of Plenty, NZInstallation Date: June 2020 Carrier Size: DN710mm PE water pipelineCasing Size: 1040mm steel jacking casingRun Length: 43mSpacer Model: HDXT103 Where are the kwik-Zip spacers being used and why? The kwik-Zip spacers have been installed as part of the Waiari trunk watermain project located in Te Puke,…


  • Haughton Pipeline Duplication Townsville

    Haughton Pipeline Duplication Townsville

    Project: Haughton Pipeline Duplication TownsvilleCarrier Size: DN1800 GRPCasing Size: DN2100 RC Jacking PipeRun Length: 54m & 120mSpacer Model: HDX-90 (90mm high) As part of the 36km Haughton Pipeline Duplication Project Kwik-ZIP HDX-90 spacers were used to facilitate the slip-lining of DN1800 GRP Carrier Pipe at 2 locations – a 54m crossing of Woodstock Giru Rd…


  • Holden Reservoir Inlet Pipeline – Melton Hwy Crossing

    Holden Reservoir Inlet Pipeline – Melton Hwy Crossing

    Project: Holden Reservoir Inlet Pipeline – Melton Hwy Crossing for Western Water MelbourneCarrier Size: DN800 MSCL Water MainCasing Size: DN1050 Steel CasingSpacer Model: HDX-90 (90mm high) Kwik-ZIP HDX-90 spacers were installed to facilitate the slip-lining of an 813mm cement lined steel water main into a steel encasing pipe by Pezzimenti Trenchless. Kwik-ZIP’s large range of…


  • Diona – Northern Road Upgrade Stage 5 (Sydney)

    Diona – Northern Road Upgrade Stage 5 (Sydney)

    Project: Diona – Northern Road Upgrade Stage 5 (Sydney)Carrier Size: DN900 MSCL (Sintakote)Casing Size: DN1200 RCP Jacking PipeRun Length: 160M total – 76m Casing + 8m Pit + 76m CasingSpacer Model: HDX-38 (38mm high) Kwik-ZIP HDX-38 spacers were installed to facilitate the slip-lining of 160m of DN900 MSCL (Sintakote) carrier pipe into DN1200 Jacking Pipe…


  • WBHO & SRG JV – Wanneroo Road and Ocean Reef Road Interchange Project

    WBHO & SRG JV – Wanneroo Road and Ocean Reef Road Interchange Project

    Project: WBHO & SRG JV – Wanneroo Road and Ocean Reef Road Interchange ProjectCarrier Size: DN900 MSCL pipeCasing Size: 1200mm RCPSpacer Model: HDX-125 Kwik-ZIP HDX-125 spacers were utilized to facilitate the sliplining of two service sleeves of 61 and 57 metres in length to support infrastructure modifications for the Wanneroo Road and Ocean Reef Road…


  • Why Use Centralizers

    Why Use Centralizers

    Centralizers in the Drilling Industry. In the drilling industries there are a number of ways in which contractors can play a key role in groundwater protection and management, namely; The use of Centralizers assists to support the contractor’s role in groundwater protection and management by; The use of Centralizers also assists the contractors to adhere…


  • West Gate Tunnel Project – West Zone Soil Nail Wall, Melbourne

    West Gate Tunnel Project – West Zone Soil Nail Wall, Melbourne

    Project: West Gate Tunnel Project – West Zone Soil Nail Wall, Melbourne Client: Geotechnical Engineering Spacer Model: GT 20 Kwik-ZIP GT 20 model spacers are being utilised by Geotechnical Engineering as internal spacers for their sheathed soil nails. The sheathed soil nails are being installed on the West Zone Soil Nail Wall as part of…


  • Live Sewer Re-Line

    Live Sewer Re-Line

    Project: Live Sewer Re-Line Carrier Size: Nominal 42” & 39” Semi Elliptical (SE) Casing Size: Variable  – Semi Elliptical Spacer Model: HD 50 & HDX-38 Kwik-ZIP HD-50 and HDX-38 spacers were utilized to facilitate the sliplining of new semi-Elliptical FRP liner pipe around curves into an existing concrete semi-elliptical pipe for a sewer replacement project…


  • Chandler Highway Upgrade Sewer Relocation

    Chandler Highway Upgrade Sewer Relocation

    Project: Chandler Highway Upgrade Sewer Relocation Client: Adept Civil Group Carrier Size: 50m of DN150 IPLEX RESTRAIN™ PVC Casing Size: 355mm Open Bore Spacer Model: HD 75 Adept Civil Group utilised Kwik-ZIP HD-75 spacers to protect and centralise an IPLEX DN150 RESTRAIN™ Pipe installation during the relocation of sewer for the Chandler Highway Upgrade. kwik-ZIP’s…


  • Nowra Wastewater Treatment Plant

    Nowra Wastewater Treatment Plant

    Project: Nowra Wastewater Treatment Plant, Southern Incoming Mains – Stage 1 Terara NSW. Client: Shoalhaven City Council Carrier Size: 2x DN450 HDPE x DN560 HDPE Spacer Model: HDX 38 Kwik-ZIP HDX38 casing spacers were utilised on three 60m sections of the new parallel wastewater pressure mains to the new Nowra Wastewater Treatment Plant at Terara,…


  • South Grafton PS Outfall Pipes,  South Grafton

    South Grafton PS Outfall Pipes, South Grafton

    Project:  South Grafton PS Outfall Pipes, South Grafton Contractor: Ledonne Constructions Pty Ltd Carrier Size:  DN375 M-PVC Casing Size:  DN600 Mild Steel casing Spacer Model:  HDX 65 Kwik-ZIP HDX65 casing spacers were utilised for the South Grafton PS Outfall Pipes project. Kwik-ZIP HDX Spacers are approved by WSAA and meet the requirements of their Product Specification…


  • Rising Sewer Main for Grafton Bridge Utilities Project

    Rising Sewer Main for Grafton Bridge Utilities Project

    Project:  Rising Sewer Main for Grafton Bridge Utilities Project Contractor: Ledonne Constructions Pty Ltd Carrier Size:  DN375 M-PVC Casing Size:  DN600 Mild Steel casing Spacer Model:  HDX 65 Kwik-ZIP HDX65 casing spacers were utilised for the Rising Sewer Main for Grafton Bridge Utilities project. The project required two 30m length of DN375 M-PVC carrier pipe…


  • Watermain Renewal Toorak Road, Victoria

    Watermain Renewal Toorak Road, Victoria

    Project:  Watermain Renewal Toorak Road, Victoria Contractor:  Quinn Civil Pty Ltd Carrier Pipe:  DN750 into DN1050 concrete jacking pipe Spacer Model:  HDX 90 The Watermain Renewal at Toorak Road, South Yarra involved the utilisation of kwik-ZIP HDX-90 spacers at 1M intervals to support and protect the installation of MSCL carrier pipe into a concrete jacking pipe.…


  • Watermain Adjustment, Campbell’s Cove, The Rocks, Sydney

    Watermain Adjustment, Campbell’s Cove, The Rocks, Sydney

    Project:  Watermain Adjustment, Campbell’s Cove, The Rocks, Sydney Client:  Axis Plumbing for Sydney Water Carrier Size:  DN200 HDPE PN16 Casing Size:  DN375 RCP Casing Spacer Model:  HDX 65 Kwik-ZIP HDX65 casing spacers were utilised for the replacement of a 100 metre Watermain in front of the historic Campbell’s Stores building at the Rocks. The spacers…


  • Gravity Sewer Upgrade,  Greenvale Victoria

    Gravity Sewer Upgrade, Greenvale Victoria

    Project: Gravity Sewer upgrade, Greenvale VictoriaContractor: L&D Micro TunnellingClient: Adept Drainage for Yarra Valley Water Carrier Pipe: Iplex DN300 PVC RESTRAIN™ sewer pipe in a open boreSpacer Model: HD30Bore Size: 380mm OD Open bore application The Greenvale Sewer project required 8 separate bores totalling 260 meters of drilling in various types of ground conditions. L&D Micro Tunnelling…


  • CO2 EOR pilot project, Saudi Arabia | Non-Metallic Centralizers

    CO2 EOR pilot project, Saudi Arabia | Non-Metallic Centralizers

    Project:  CO2 EOR pilot project, Saudi ArabiaClient:  Saudi Aramco, Saudi ArabiaApplication: carbon dioxide (CO2) enhanced oil recovery (EOR) wellSpacer Model: HD 30 – non-metallic centralizers When faced with technical challenges at a carbon dioxide (CO2) enhanced oil recovery (EOR) well, the world’s largest oil company, Saudi Aramco, reached out to kwik-ZIP to help keep their casing intact. Oil recovery…


  • Merri Creek Sewer Relief Project

    Merri Creek Sewer Relief Project

    Project: Merri Creek Sewer Relief Project, Coburg Victoria Client: Land Engineering, Quinn Civil, JHL Civil for Melbourne Water and CPB Carrier Pipe: Iplex DN225 RESTRAIN™ Sewer Pipe Spacer Model: HD 50 Bore Size: 380mm OD L&D Microtunnelling used Kwik-ZIP spacers to protect and centralise an Iplex DN225 RESTRAIN™ Sewer Pipe during its installation on the Merri…


  • Elizabeth Water Tank Column Rehabilitation

    Elizabeth Water Tank Column Rehabilitation

    Project: Elizabeth Water Tank Column RehabilitationClient: Denso Australia / SA WaterApplication: Stand-off for SeaShield™ Pile Jacket SystemSpacer Model: 155 HT-E Kwik-ZIP provided casing spacers to Denso Australia for utilisation as a component of their SeaShield™ 400/500 system.The SeaShield™ system is an encapsulation system that consists of a Fibreform Jacket, C-Grid® 450 reinforcing, Denso 510 UW…


  • Nancarrow Avenue, Meadowbank bundled conduit project

    Nancarrow Avenue, Meadowbank bundled conduit project

    Project: Nancarrow Avenue, Meadowbank bundled conduit projectClient: Diona for AusgridCarrier Size: 4 x 180mm PVC ConduitsCasing Size: 700mm Open BoreSpacer Model: HDX 65 Kwik-ZIP provided HDX65 casing spacers for a bundled conduit installation being carried out by Diona Civil Engineering for Ausgrid.  The project required a 120m long PVC conduit bundle (4x 180mm PVC conduits)…


  • Eaton to Bunbury Wastewater Pressure Main Project

    Eaton to Bunbury Wastewater Pressure Main Project

    Project: Eaton to Bunbury Wastewater Pressure Main ProjectClient: DM Civil / Water CorporationApplication: Six cased crossingsSpacer Model: HDX 38 & 65 Trenchless construction was utilised at the Eaton to Bunbury Wastewater Pressure Main Project, south of Perth. Water Corporation commissioned the pipe installation, which now redirects wastewater flows from Eaton to the Bunbury Wastewater Treatment Plant…


  • Olympic Hwy & Railway Cased Crossing

    Olympic Hwy & Railway Cased Crossing

    Project: Olympic Hwy & Railway Cased CrossingClient: Riverina Water County CouncilCarrier Pipe: DN450 DICLSpacer Model: HDX 90 Kwik-ZIP provided casing spacers to Riverina Water County Council – through our local distributor Reece Civil – for use on a cased crossing under the Olympic Hwy near Wagga Wagga, NSW. The project required 70m of DN450 DICL pipe to…


  • Mountain Creek to Kawana Sewerage Pipeline Project

    Mountain Creek to Kawana Sewerage Pipeline Project

    Kwik-ZIP provided casing spacers to Pipeline Drillers for use by their construction partner Dormway on the Mountain Creek to Kawana Sewerage Pipeline Project. The project, located in the Sunshine Coast regional suburbs of Mountain Creek and Parrearra, will improve the capacity and efficiency of the sewerage network. The kwik-ZIP model HDX 38 spacers were selected…