South Street Gravity Sewer
Project: South Street Gravity Sewer Carrier Size: DN600 SewerMax® carrier pipe with 682mm OD Casing Size: DN800 Mild Steel with 794mm ID Run Length: 64m Spacer Model: HDXT 43 Kwik-ZIP® HDXT 43 spacers were installed to facilitate the slip-lining of a crossing as part of the South Street Gravity Sewer Project. …
Cairns Water Security Project
Project: Cairns Water Security Project Carrier Sizes: 1125mm, 914mm, 508mm, & 914mm OD MSCL carriers Casing Size 1,351mm, 692mm, & 1193mm ID MSCL casings over numerous crossings Run Length: 2 x 61m runs and 3 x 40m runs Spacer Model: HDXT 103 and HDXT 63’s Kwik-ZIP® HDXT 103 and HDXT 63’s…
A465 Heads of the valley Road Widening – Hirwan – South Wales
Project: A465 Heads of the Valley Road Widening – Pipe Diversions Using Kwik-ZIP HDXT-153 Spacers Carrier Size: 711mm and 1,118mm OD coated and lined steel pipe Casing Size: 1,050mm and 1,500mm ID precast concrete Run Length: 4 x runs (2 x 35m and 2 x 47.5m) Spacer…
M1 Pacific Motorway Extension
Project: M1 Pacific Motorway Extension Carrier Size: 1219mm OD SINTAKOTE® Steel MSCL Casing Size: 1574mm ID GRP Run Length: 2 x runs (62m & 127m) Spacer Model: HDXT-153 (153mm high) Kwik-ZIP customer Vaughan Civil recently utilised Kwik-ZIP HDXT-153 spacers were recently used to facilitate the slip-lining of two water main…
Alkimos SDP Yanchep Rail Corridor
Project: Alkimos SDP Yanchep Rail Corridor Carrier Size: 914mm & 1422 SINTAKOTE® Steel MSCL Casing Size: 1399 & 1708mm RCJP Run Length: 2 x runs – 56m each Spacer Model: HDXT-103 (103mm high) with Load Inserts (LI-XT-103) A key Kwik-ZIP customer recently utilised Kwik-ZIP HDXT-103 spacers with kwik-ZIP load…
Claremont Rail – Cased Crossing – Claremont, WA
Project: Claremont Rail – Cased Crossing Claremont, Western AustraliaCarrier Size: 180mm PE Water MainCasing Size: RCP 500mm (ID)Spacer Model: HDXT-153 (153mm high) Kwik-ZIP® HDXT-153 spacers were installed to facilitatethe slip-lining of a 180mm PE Water Main into an RCP casing for a cased crossing as part of the Claremont Rail Project by GM Microtunnelling. As…
Metro Tunnel – Arden Street Station, Melbourne Victoria
Project: Metro Tunnel – Arden Street Station, Melbourne VictoriaCarrier Size: 225 PVCCasing Size: 370mm BoreSpacer Model: HD-50 (50mm high) Kwik-ZIP® HD-50 spacers were utilised to facilitate the installation of 2 x 10-meter storm water pipes as part of Metro Tunnels development of the new Arden Street Station. kwik-ZIP’s large range of spacers caters for a…
HEB Construction – Waiari Trunk Watermain
Project: Waiari Trunk Watermain Part ALocation: Bay of Plenty, NZInstallation Date: June 2020 Carrier Size: DN710mm PE water pipelineCasing Size: 1040mm steel jacking casingRun Length: 43mSpacer Model: HDXT103 Where are the kwik-Zip spacers being used and why? The kwik-Zip spacers have been installed as part of the Waiari trunk watermain project located in Te Puke,…
Haughton Pipeline Duplication Townsville
Project: Haughton Pipeline Duplication TownsvilleCarrier Size: DN1800 GRPCasing Size: DN2100 RC Jacking PipeRun Length: 54m & 120mSpacer Model: HDX-90 (90mm high) As part of the 36km Haughton Pipeline Duplication Project Kwik-ZIP HDX-90 spacers were used to facilitate the slip-lining of DN1800 GRP Carrier Pipe at 2 locations – a 54m crossing of Woodstock Giru Rd…
Diona – Northern Road Upgrade Stage 5 (Sydney)
Project: Diona – Northern Road Upgrade Stage 5 (Sydney)Carrier Size: DN900 MSCL (Sintakote)Casing Size: DN1200 RCP Jacking PipeRun Length: 160M total – 76m Casing + 8m Pit + 76m CasingSpacer Model: HDX-38 (38mm high) Kwik-ZIP HDX-38 spacers were installed to facilitate the slip-lining of 160m of DN900 MSCL (Sintakote) carrier pipe into DN1200 Jacking Pipe…
Nowra Wastewater Treatment Plant
Project: Nowra Wastewater Treatment Plant, Southern Incoming Mains – Stage 1 Terara NSW. Client: Shoalhaven City Council Carrier Size: 2x DN450 HDPE x DN560 HDPE Spacer Model: HDX 38 Kwik-ZIP HDX38 casing spacers were utilised on three 60m sections of the new parallel wastewater pressure mains to the new Nowra Wastewater Treatment Plant at Terara,…
South Grafton PS Outfall Pipes, South Grafton
Project: South Grafton PS Outfall Pipes, South Grafton Contractor: Ledonne Constructions Pty Ltd Carrier Size: DN375 M-PVC Casing Size: DN600 Mild Steel casing Spacer Model: HDX 65 Kwik-ZIP HDX65 casing spacers were utilised for the South Grafton PS Outfall Pipes project. Kwik-ZIP HDX Spacers are approved by WSAA and meet the requirements of their Product Specification…
Rising Sewer Main for Grafton Bridge Utilities Project
Project: Rising Sewer Main for Grafton Bridge Utilities Project Contractor: Ledonne Constructions Pty Ltd Carrier Size: DN375 M-PVC Casing Size: DN600 Mild Steel casing Spacer Model: HDX 65 Kwik-ZIP HDX65 casing spacers were utilised for the Rising Sewer Main for Grafton Bridge Utilities project. The project required two 30m length of DN375 M-PVC carrier pipe…
Watermain Renewal Toorak Road, Victoria
Project: Watermain Renewal Toorak Road, Victoria Contractor: Quinn Civil Pty Ltd Carrier Pipe: DN750 into DN1050 concrete jacking pipe Spacer Model: HDX 90 The Watermain Renewal at Toorak Road, South Yarra involved the utilisation of kwik-ZIP HDX-90 spacers at 1M intervals to support and protect the installation of MSCL carrier pipe into a concrete jacking pipe.…
Watermain Adjustment, Campbell’s Cove, The Rocks, Sydney
Project: Watermain Adjustment, Campbell’s Cove, The Rocks, Sydney Client: Axis Plumbing for Sydney Water Carrier Size: DN200 HDPE PN16 Casing Size: DN375 RCP Casing Spacer Model: HDX 65 Kwik-ZIP HDX65 casing spacers were utilised for the replacement of a 100 metre Watermain in front of the historic Campbell’s Stores building at the Rocks. The spacers…
Gravity Sewer Upgrade, Greenvale Victoria
Project: Gravity Sewer upgrade, Greenvale VictoriaContractor: L&D Micro TunnellingClient: Adept Drainage for Yarra Valley Water Carrier Pipe: Iplex DN300 PVC RESTRAIN™ sewer pipe in a open boreSpacer Model: HD30Bore Size: 380mm OD Open bore application The Greenvale Sewer project required 8 separate bores totalling 260 meters of drilling in various types of ground conditions. L&D Micro Tunnelling…
CO2 EOR pilot project, Saudi Arabia | Non-Metallic Centralizers
Project: CO2 EOR pilot project, Saudi ArabiaClient: Saudi Aramco, Saudi ArabiaApplication: carbon dioxide (CO2) enhanced oil recovery (EOR) wellSpacer Model: HD 30 – non-metallic centralizers When faced with technical challenges at a carbon dioxide (CO2) enhanced oil recovery (EOR) well, the world’s largest oil company, Saudi Aramco, reached out to kwik-ZIP to help keep their casing intact. Oil recovery…
Elizabeth Water Tank Column Rehabilitation
Project: Elizabeth Water Tank Column RehabilitationClient: Denso Australia / SA WaterApplication: Stand-off for SeaShield™ Pile Jacket SystemSpacer Model: 155 HT-E Kwik-ZIP provided casing spacers to Denso Australia for utilisation as a component of their SeaShield™ 400/500 system.The SeaShield™ system is an encapsulation system that consists of a Fibreform Jacket, C-Grid® 450 reinforcing, Denso 510 UW…
Nancarrow Avenue, Meadowbank bundled conduit project
Project: Nancarrow Avenue, Meadowbank bundled conduit projectClient: Diona for AusgridCarrier Size: 4 x 180mm PVC ConduitsCasing Size: 700mm Open BoreSpacer Model: HDX 65 Kwik-ZIP provided HDX65 casing spacers for a bundled conduit installation being carried out by Diona Civil Engineering for Ausgrid. The project required a 120m long PVC conduit bundle (4x 180mm PVC conduits)…
Eaton to Bunbury Wastewater Pressure Main Project
Project: Eaton to Bunbury Wastewater Pressure Main ProjectClient: DM Civil / Water CorporationApplication: Six cased crossingsSpacer Model: HDX 38 & 65 Trenchless construction was utilised at the Eaton to Bunbury Wastewater Pressure Main Project, south of Perth. Water Corporation commissioned the pipe installation, which now redirects wastewater flows from Eaton to the Bunbury Wastewater Treatment Plant…
Olympic Hwy & Railway Cased Crossing
Project: Olympic Hwy & Railway Cased CrossingClient: Riverina Water County CouncilCarrier Pipe: DN450 DICLSpacer Model: HDX 90 Kwik-ZIP provided casing spacers to Riverina Water County Council – through our local distributor Reece Civil – for use on a cased crossing under the Olympic Hwy near Wagga Wagga, NSW. The project required 70m of DN450 DICL pipe to…
Mountain Creek to Kawana Sewerage Pipeline Project
Kwik-ZIP provided casing spacers to Pipeline Drillers for use by their construction partner Dormway on the Mountain Creek to Kawana Sewerage Pipeline Project. The project, located in the Sunshine Coast regional suburbs of Mountain Creek and Parrearra, will improve the capacity and efficiency of the sewerage network. The kwik-ZIP model HDX 38 spacers were selected…














































