
Complying with spacing design requirements, codes and standards
With the various codes and standards governing casing spacers becoming well known and regularly referenced in many project design documentation it becomes important for contractors to ensure these codes and standards are adhered too. The Water Services Association of Australia (WSAA) code (WSA PS-324) Casing Spacers and Melbourne Retail Water Association’s (MRWA) standards (MRWA-W-210, MRWA-S-208…

Metro Tunnel – Arden Street Station, Melbourne Victoria
Project: Metro Tunnel – Arden Street Station, Melbourne VictoriaCarrier Size: 225 PVCCasing Size: 370mm BoreSpacer Model: HD-50 (50mm high) Kwik-ZIP® HD-50 spacers were utilised to facilitate the installation of 2 x 10-meter storm water pipes as part of Metro Tunnels development of the new Arden Street Station. kwik-ZIP’s large range of spacers caters for a…

Rising Sewer Main for Grafton Bridge Utilities Project
Project: Rising Sewer Main for Grafton Bridge Utilities Project Contractor: Ledonne Constructions Pty Ltd Carrier Size: DN375 M-PVC Casing Size: DN600 Mild Steel casing Spacer Model: HDX 65 Kwik-ZIP HDX65 casing spacers were utilised for the Rising Sewer Main for Grafton Bridge Utilities project. The project required two 30m length of DN375 M-PVC carrier pipe…

Watermain Renewal Toorak Road, Victoria
Project: Watermain Renewal Toorak Road, Victoria Contractor: Quinn Civil Pty Ltd Carrier Pipe: DN750 into DN1050 concrete jacking pipe Spacer Model: HDX 90 The Watermain Renewal at Toorak Road, South Yarra involved the utilisation of kwik-ZIP HDX-90 spacers at 1M intervals to support and protect the installation of MSCL carrier pipe into a concrete jacking pipe.…

Watermain Adjustment, Campbell’s Cove, The Rocks, Sydney
Project: Watermain Adjustment, Campbell’s Cove, The Rocks, Sydney Client: Axis Plumbing for Sydney Water Carrier Size: DN200 HDPE PN16 Casing Size: DN375 RCP Casing Spacer Model: HDX 65 Kwik-ZIP HDX65 casing spacers were utilised for the replacement of a 100 metre Watermain in front of the historic Campbell’s Stores building at the Rocks. The spacers…

A Thermoplastic Solution
Selecting components made from an appropriate material is imperative for completing a successful pipeline installation and ensuring its long-term integrity. While spacers can be manufactured from a range of materials – including metal and wood – high grade thermoplastic is proven to provide the most benefits with the least drawbacks. Spacers are used to separate…

Gravity Sewer Upgrade, Greenvale Victoria
Project: Gravity Sewer upgrade, Greenvale VictoriaContractor: L&D Micro TunnellingClient: Adept Drainage for Yarra Valley Water Carrier Pipe: Iplex DN300 PVC RESTRAIN™ sewer pipe in a open boreSpacer Model: HD30Bore Size: 380mm OD Open bore application The Greenvale Sewer project required 8 separate bores totalling 260 meters of drilling in various types of ground conditions. L&D Micro Tunnelling…

CO2 EOR pilot project, Saudi Arabia | Non-Metallic Centralizers
Project: CO2 EOR pilot project, Saudi ArabiaClient: Saudi Aramco, Saudi ArabiaApplication: carbon dioxide (CO2) enhanced oil recovery (EOR) wellSpacer Model: HD 30 – non-metallic centralizers When faced with technical challenges at a carbon dioxide (CO2) enhanced oil recovery (EOR) well, the world’s largest oil company, Saudi Aramco, reached out to kwik-ZIP to help keep their casing intact. Oil recovery…








