Upper South Creek Treated Water Main
Project: Upper South Creek Treated Water MainCarrier Size: 914mm SINTAKOTE® Steel MSCLCasing Size: 1200mm RCJPRun Length:105mSpacer Model: HDXT-103 (103mm high) Kwik-ZIP customers Jonishan recently utilised Kwik-ZIP HDXT-103 spacers to facilitate the slip-lining of a 914mm SINTAKOTE® Steel MSCL carrier pipe into a 1200mm ID RCJP casing for the Upper South Creek Treated Water Main.This installation…

Trans Mountain Pipeline Expansion Project
Project: Trans Mountain Pipeline ProjectLocation: Alberta & British Columbia – Canada Carrier Size: 30” Steel 483 grade 2 pipeCasing Size: 60” steel casingSpacer Model: HDXT-58W with Load Inserts Kwik-ZIP spacers were recently utilised on a specific section of the Trans Mountain Pipeline Expansion Project in Canada to assist one of the contractors working on the…

Fitzroy to Gladstone Pipeline
Project: Fitzroy to Gladstone (F2G) Pipeline Location: Central Queensland Carrier Size: 1067mm OD SINTAKOTE® Steel MSCLCasing Size: 1290mm ID RCJP casingRun Length: 4 x crossings (26M, 107m, 135m & 16m)Spacer Model: HDX-90 (90mm high) Kwik-ZIP customers GCE Contractors utilised Kwik-ZIP HDX-90 spacers to facilitate the slip-lining of a 1067mm OD SINTAKOTE® MSCL carrier pipe into…

Gosnells Main Pumping Station – Wastewater pressure Main Realignment
Project: Gosnells Main Pumping Station – Wastewater pressure RealignmentLocation: Gosnells WA Carrier Size: DN900 MSCL carrierCasing Size: DN1200 RC Jacking pipeRun Length: 48m under rail crossingSpacer Model: HDXT 103’s Kwik-ZIP® HDXT-103 spacers were installed to facilitate the slip-lining of a MSCL Wastewater pressure main into a RC Jacking pipe running under a rail line for…

Forches Cross LTS Diversion, Newton Abbot, Devon, UK
Project: Forches Cross LTS Diversion, Newton Abbot, DevonLocation: UK Carrier Size: 500mm OD API 5L steel pipe (L360)Casing Size: 1200mm ID Concrete sleeveRun Length: 40m crossingSpacer Model: HDX-90 Kwik-ZIP HDX-90 spacers were recently utilised on a gas main crossing in Devon, Southwest England. The Forches Cross LTS Diversion involved the sleeving of a 40m 500mm…

Kwik-ZIP to Exhibit at Water Industry Operations (WIOA) Conference & Exhibition 2023.
Kwik-ZIP are pleased to be exhibiting at the Water Industry Operations (WIOA) Conference & Exhibition at Exhibition Park in Canberra on 1 & 2 November 2023. You will find us on Booth 63, and we would be happy to discuss our product range and answer any questions you may have regarding our products.

Kwik-ZIP to Exhibit at Australian Pipelines and Gas Association (APGA) Exhibition 2023.
Kwik-ZIP to Exhibit at Australian Pipelines and Gas Association (APGA) Exhibition 2023. Kwik-ZIP are pleased to be exhibiting at the Australian Pipelines and Gas Association (APGA) Exhibition at the Perth Convention and Exhibition Centre in Perth on 14-17 October 2023. You will find us on Booth 62, and we would be happy to discuss our product…

Western Outer Ring Main (‘WORM’) – Buried Gas Transmission Pipeline Project
Project: Western Outer Ring Main (‘WORM’) – Buried Gas Transmission Pipeline Project Location: Victoria Carrier Size: 508mm OD high-strength steel line pipe with an external epoxy coatingCasing Size: Various – Crossing dependentRun Length: Approx 500m of cased crossingsSpacer Model: HDX-38’s, HDX-125 and HDXT-63’s The Western Outer Ring Main project in Victoria is a pipeline installation…

Kwik-ZIP to Exhibit at NO-DIG Down Under 2023.
Kwik-ZIP to Exhibit at NO-DIG Down Under 2023. Kwik-ZIP are pleased to be exhibiting at NO-DIG Down Under 2023 at the Brisbane Convention and Exhibition Centre on 13 & 14 September 2023. You will find us on Booth 46, and we would be happy to discuss our product range and answer any questions you may have…

South Geelong Station – Water Main Relocation Project, Victoria – Barwon Water
Project: South Geelong Station – Water Main Relocation Project Location: Victoria – Barwon Water Carrier Size: 660mm OD MSCL Steel Mains Sintakote®Casing Size: 800mm ID RCP casingRun Length: 54mSpacer Model: HDXT-58W (58mm high) On a recent Water Main relocation project in Victoria, McConnell Dowell utilised Kwik-ZIP HDXT-58W spacers to facilitate the slip-lining of a 660mm…

Barwon Water DN450 Relocation Project – Marshall, Victoria
Project: Barwon Water DN450 Relocation ProjectLocation: Marshall, Victoria Carrier Size: 560mm OD HDPE Water MainCasing Size: 794mm ID GRP casingRun Length: 260mSpacer Model: HDXT-58W (58mm high) On a recent Water Main Project in Victoria, McConnell Dowell utilised Kwik-ZIP HDXT-58W spacers to facilitate the slip-lining of a 560mmmm HDPE carrier pipe over a 260-metre run. Whilst…

Kwik-ZIP to Exhibit at Ozwater’23
We are excited to exhibit at the upcoming Ozwater’23 event at the ICC, Sydney from May 10-12! You will find us on Stand C27, and we would be happy to discuss our product range and answer any questions you may have regarding our products. Grab your free Trade Visitor pass and join us for an incredible…

Kwik-ZIP Offers the Best Corrugated Pipe Installations Solution
Designed to be compatible with all types of pipe material, kwik-ZIP’s HD and HDX/HDXT spacer system series can be used on and in corrugated pipe installations. Manufactured from high-grade thermoplastic, kwik-ZIP’s casing spacer and centraliser products are used and recommended by pipeline and civil contractors, water and gas utilities, drilling companies and international engineering firms.…

Kwik-ZIP to Exhibit at WIOA Bendigo 2023
Kwik-ZIP to Exhibit at 2023 Victorian Water Industry Operations Conference & Exhibition. Kwik-ZIP are pleased to be exhibiting at the 2023 Water Industry Operators Association of Australia (WIOA) 84th Victorian Water Industry Operations Conference and Exhibition at the Bendigo Exhibition Centre on the 29 & 30th March 2023. You will find us on Booth 116,…

kwik-ZIP spacers help with corrosion management
Corrosion accelerates degradation and reduces the life of pipeline infrastructure, costing the industry millions of dollars in rehabilitation, rebuilding, and down time. kwik-ZIP knows the importance of having a corrosion management system in place and spacers are a readily available solution component available to help and reduce costs. This article featured in the February edition of The Australian Pipeliner. All content…