Drilling

  • Kwik-ZIP Centralisers is exhibiting at DRILL26!

    Kwik-ZIP Centralisers is exhibiting at DRILL26!

    We’re excited to be exhibiting at DRILL26, the Australian Drilling Industry Association’s major industry event, and look forward to connecting with drilling professionals from across Australia and beyond. 📅 22–24 September 2026📍 Adelaide Convention Centre, Adelaide SA📌 Kwik-ZIP – Stand 54 Make sure you visit us at Stand 54! Come and meet the Kwik-ZIP team, see our range of engineered…

    read more

  • 🚰 Kwik-ZIP is exhibiting at WIOA 2026 NSW!

    🚰 Kwik-ZIP is exhibiting at WIOA 2026 NSW!

    We’re excited to be exhibiting at the WIOA 2026 NSW Water Industry Operations Conference & Exhibition. 📅 9–10 September 2026📍 Newcastle Racecourse, Newcastle NSW📌 Stand 107 Come and visit the Kwik-ZIP team to discover how our innovative spacer and centraliser solutions are helping protect casing, improve installation efficiency and support long-term performance in water infrastructure applications. Our engineered thermoplastic products provide…

    read more

  • Water Main Upgrades

    Water Main Upgrades

    Project: Water Main Upgrades Carrier Size: DN125 PE Water main Casing Size: DN330 ST Gas Main (abandoned) Spacer Model: HD-30 (30mm high) Kwik-ZIP® HD-30 spacers were installed to facilitate the slip-lining of DN125 PE Water Main into abandoned DN330 ST Gas Mains.  Given the abandoned gas mains had numerous internal protrusions (joins and welds) there was…

    read more

  • Claremont Rail – Cased Crossing – Claremont, WA

    Claremont Rail – Cased Crossing – Claremont, WA

    Project: Claremont Rail – Cased Crossing Claremont, Western AustraliaCarrier Size: 180mm PE Water MainCasing Size: RCP 500mm (ID)Spacer Model: HDXT-153 (153mm high) Kwik-ZIP® HDXT-153 spacers were installed to facilitatethe slip-lining of a 180mm PE Water Main into an RCP casing for a cased crossing as part of the Claremont Rail Project by GM Microtunnelling. As…

    read more

  • Complying with spacing design requirements, codes and standards

    Complying with spacing design requirements, codes and standards

    With the various codes and standards governing casing spacers becoming well known and regularly referenced in many project design documentation it becomes important for contractors to ensure these codes and standards are adhered too. The Water Services Association of Australia (WSAA) code (WSA PS-324) Casing Spacers and Melbourne Retail Water Association’s (MRWA) standards (MRWA-W-210, MRWA-S-208…

    read more

  • Why Use Centralizers

    Why Use Centralizers

    Centralizers in the Drilling Industry. In the drilling industries there are a number of ways in which contractors can play a key role in groundwater protection and management, namely; The use of Centralizers assists to support the contractor’s role in groundwater protection and management by; The use of Centralizers also assists the contractors to adhere…

    read more

  • Supporting micropiles from the ground up

    As urban areas continue to rapidly expand and become increasingly congested, the use of micropiles as a construction technique is becoming increasingly relevant, due to their applicability in limited space environments and their high load carrying capacity. Micropiles are ideal for projects in such areas as they require equipment with smaller footprints during installation, can…

    read more

  • Four ways centralisers benefit drilling projects

    When it comes to the long-term success of a drilling project, using a centralizer made from the right material can aid a well’s structural integrity, improve the performance and longevity of a gravel packed screen assembly, and reduce the effect of corrosion on the casing. However, the varied nature of centralizer applications and job sites,…

    read more

  • Overcoming the challenges of CSG projects

    Queensland Gas Company (QGC) has recently announced that it will drill 161 new coal seam gas (CSG) wells in the Surat Basin in Queensland, a move that will enable further supply to both domestic customers and natural gas exports. There are a number of challenges that such projects present, such as remote locations, the number…

    read more

  • kwik-ZIP continues relationship with ADITC

    kwik-ZIP is proud to continue its relationship with the Australian Drilling Industry Training Committee (ADITC) in developing skill levels within the drilling industry by the continued sponsorship of the ADITC Cement Grouting Training Course.  Participants receive a nationally endorsed and recognised Statement of Attainment as part of the Australian Qualification Framework for RIINHB218D – Assist grouting…

    read more

  • Seven solutions for a perfectly spaced pipeline

    A perfectly spaced pipe is a critical element of a successful pipeline installation. Well chosen spacers can save time, money and prolong the life of your pipeline. Below we outline seven factors to consider when choosing spacers for your next pipeline project. Designed and developed by drilling professionals, kwik-ZIP spacers have been helping the pipeline…

    read more

  • Benefits of using Australian products in the drilling industry

    Governments and manufacturers have been advocating the use of Australian owned products for many years.  This is no different within the drilling industry, as the practical benefits of working with locally supplied products remain clear.   Technical support Whether it be a pipe casing, a spacing system or a piece of machinery, Australian owned products…

    read more

  • Development in the Surat

    Development in the Surat

    QGC has recently embarked on a $1.7 billion development of gas tenements in Queensland that will see the construction of 300-400 wells in the Surat Basin. The works are part of the company’s continuous development to sustain gas supply to both domestic customers and the QCLNG plant near Gladstone, and are set to provide a…

    read more

  • Got a pipe problem? Challenges faced when centralising a pipe

    Across all pipeline construction and installation, pipe centralisation is crucial to overall pipe function, integrity and lifespan. As different materials are used for pipe casings, it is important that the right centralizer or spacer is chosen for your project. Civil and pipelines Pipeline surface cradle stanchions or piles constructed from square or C section beams…

    read more

  • Groundwater management: how centralisers can help

    As the driest inhabited continent on earth, rapid depletion of Australia’s groundwater resources is becoming an important issue for Australia’s economy and wellbeing. As the mining and drilling industries are major users of this valuable asset, each has an important role to play in the protection and management of the country’s finite supply.  In this…

    read more